This collection spans state utility regulation, planning materials, and selected transmission-system operator documents. A filing or request for proposals is not by itself evidence that a proposed facility was built or approved.
Complete collections: 1803 Electric — 2026 IRP initiation filing
Complete collections: MISO — 1803 Electric Cooperative records
These links lead to the original archived files. Refer to each collection’s source notes for provenance, redactions, and completeness limits.